top of page

Home › Service Areas › Coon Rapids › Concrete Washing

ANOKA COUNTY, MN

Concrete washing in Coon Rapids, MN

The one surface around your home where real pressure is the right tool.

Coon Rapids driveways, walks and patios take salt, sand, freeze-thaw and a summer of sprinkler water every year. Glass House cleans them at real pressure, through a surface cleaner rather than a wand, so the finish comes out even.

Rust and oil receive their own chemistry on request, and stripping, sanding and sealing are specialty projects Carson prices in person after testing what, if anything, is already on the slab.

A freshly cleaned concrete walkway running beside a planting bed of shrubs

HONEST EXPECTATIONS

Porous concrete may need a stronger treatment and may not return to a perfectly uniform finish. We tell you before we begin.

★ Rated 4.9 on Google · 44 reviews

Insured to $2M

Owner-operated

Based in Ham Lake

COON RAPIDS SPECIFICS

What concrete washing means in Coon Rapids

The local conditions that shape how Glass House approaches concrete washing in Coon Rapids, and the standards it holds to on every visit.

STORMWATER

Stormwater is not treated

Coon Rapids stormwater is not treated. Unlike wastewater, it never passes through a treatment plant, and runoff travels directly into local lakes, rivers, wetlands and streams. Motor oil or chemicals rinsed off a driveway and into a storm drain arrive in those lakes and streams with nothing removed along the way. Runoff is diluted heavily and watched closely, and oil is treated on the slab, not rinsed away.
 

WATER

Hard water, iron in every well

Coon Rapids water runs about 275 to 310 PPM (parts per million) of hardness, and the city reports iron and manganese in all 22 of its wells. Its plants remove both, but in summer some wells pump directly into the system. As sprinkler water dries on a house, calcium stays behind as white spots on glass, while iron and manganese oxidize into orange and brown stains on siding, brick and concrete. Rust treatment on a slab lasts only after the sprinkler heads that caused it are re-aimed.

HOMES

A median home built in 1983

The median Coon Rapids home was built in 1983, and about a quarter of homes date from the 1980s. Four decades of sun break the surface of siding and painted trim down into a chalky film, called oxidation, that streaks when rain runs over it. High pressure removes that film unevenly and can damage the surface beneath, so older siding needs a gentle, low-pressure wash. Slabs that age have seen decades of freeze-thaw and salt, and we point out any scaling.

TREES

Oak savanna and a pruning ban

Coon Rapids prohibits pruning or trimming oaks from April 1 to June 30 to protect its native oak savanna from oak wilt. It also had nearly 7,000 boulevard ash trees at risk from emerald ash borer. Oak shade keeps roofs and siding damp, which algae and moss need, and oak leaves fill gutters each fall. Ash killed by the borer turns brittle and drops limbs onto roofs and into gutters. Shaded slabs grow green film, which the pre-treatment kills before the surface cleaner lifts it.

Sources: City of Coon Rapids, 2026 Summer Newsletter; City of Coon Rapids, City Water System and Utilities FAQs; USGS, Hardness of Water; Point2Homes, Coon Rapids demographics (U.S. Census ACS 2019-2023); City of Coon Rapids, Oak Wilt Control; City of Coon Rapids, Emerald Ash Borer (2025).

HOW WE CLEAN CONCRETE

Even, stripe-free and safe for the slab

Concrete is not siding or shingles. It is the one surface where real pressure is correct, provided it is applied evenly and the slab is old enough to take it.

PRESSURE ON CONCRETE ONLY

When we say we never pressure wash, we mean your siding and your roof, which receive a soft wash at low pressure. Concrete is dense enough to take 2,000 to 3,500 psi, and on concrete that pressure is what cleans it properly.

01

Walk it and check its age

Every job starts with a walk-around. Carson looks for cracks, scaling, stains and existing sealer, and confirms the concrete is at least two years old. Sealed or stamped concrete receives a test corner first, so the method is proven on a spot nobody looks at.

02

Pre-treat the growth

A sodium hypochlorite pre-treatment goes on first, so organic growth is killed at the root rather than blasted around. Oil and rust are separate treatments with their own chemistry, handled on request in a fixed order: degreaser first, then the organic wash, then acid last and alone.

03

Surface cleaner, not a wand

A surface cleaner, a round housing with a spinning spray bar inside, lays down even passes at 2,000 to 3,500 psi. A bare wand leaves stripes, and any later sealer magnifies every overlap line, so the wand is kept for edges, steps and detail work.

04

Post-treat and detail the edges

A post-treatment evens out the tone across the whole slab. Curbs, steps, expansion joints and the edges along the house and lawn then receive a final rinse and detail, so the surface dries evenly from edge to edge.

05

Stay off for a few hours

Keep people and cars off cleaned areas for at least 3 hours. After sealing, the wait is up to 96 hours so the coating can cure as well as possible, and vehicles always wait longer than foot traffic, so plan around it.

FOR COON RAPIDS HOMES

What to know before your visit

SPRING

Wash off the winter

A spring wash takes off the salt, sand and grime winter leaves behind, and it reveals any new scaling, the flaking of the top surface, since a scaled slab should never be sealed.

SPRINKLERS

Keep rust off

Aim sprinkler heads at the lawn. Water that hits concrete leaves orange fans that trace the throw of the head, and they return after treatment until the head is moved.

PAVERS

Joint sand goes in last

On pavers, polymeric joint sand goes in only once everything is fully dry, and every grain is swept off the faces first, or it activates into a haze.
 

SEALING

Mind the weather

Cold nights and heavy morning dew are how a fresh seal turns milky. If a fall weather window is marginal, a sealing job is better booked for spring.
 

HOW PRICING WORKS

Quoted after we see the surface

YOUR CONCRETE JOB AT A GLANCE

QUOTE FIRST

Concrete washing

Quoted

Driveways, walks, patios, steps and pavers, surface cleaned

Rust or oil stain removal

Quoted

Stain-specific chemistry, on request

Stripping, sanding and sealing

In person

A 2 to 3 day project, priced by Carson in person

Concrete under 2 years old

Not yet

Pressure washing waits until the slab has cured

Builders and commercial sites

In person

Quoted in person by Carson

Every slab is different

Quote first

Concrete washing is quoted after Carson sees the surface, its age and what is on it. Stripping, sanding and sealing are priced by Carson in person, never over the phone, because the preparation and the weather window determine the job.

Carson Brenny, owner of Glass House, cleaning the glass on a front entry door with his ladder set up beside the home

THE OWNER

The person who quotes your home does the work

Glass House is owned and run by Carson Brenny, with no crews, subcontractors or handoffs. He grew up in Ham Lake, went to Blaine High School and has worked full-time in exterior cleaning for six years. The person who quotes your home is the person who arrives, does the work and walks it with you at the end.

Every job receives the gentlest method that will do the work, because too much force or too strong a mix can cause damage that no cleaning undoes. Every homeowner receives a clear explanation of what is on the house, why the method was chosen and what cleaning can and cannot fix, before any money is spent.

IN CARSON'S WORDS

“It's my neighbors' homes: their biggest investment, one of the places they spend the most time, and where the people they care about most live. It's something everyone should enjoy, and I believe that.”

Carson Brenny, owner

WHAT IS INCLUDED

What concrete washing includes, and what it does not

Concrete is the one surface that receives real pressure, and even then it is controlled. A concrete wash covers the following.

INCLUDED

In every concrete wash

•  Driveways, walks, patios, steps and pavers

•  A pre-treatment that kills organic growth

•  Even surface cleaner passes, with no wand stripes

•  A post-treatment that evens out the tone

•  Edges, curbs and expansion joints rinsed and detailed

NOT INCLUDED

Quoted separately, or not something we do

•  Concrete under two years old, which pressure would permanently etch

•  Oil, rust, iron, efflorescence, paint and graffiti stains

•  Stripping, sanding and sealing, priced by Carson in person

•  Repairing cracks, spalling and pitting

•  A perfectly uniform finish on older, porous surfaces

EQUIPMENT AND METHODS

A surface cleaner, not a bare wand

Sodium hypochlorite and a spinning surface cleaner at 2,000 to 3,500 psi, high flow. Together they clean the surface, kill organic growth and leave an even finish without etching the concrete. Sealed or stamped concrete receives a test corner first. A heated machine is available on special request for oil, because heat thins oil and draws it out of the pores; it does not come to most jobs.

COON RAPIDS QUESTIONS

Concrete Washing in Coon Rapids: FAQ

Can you clean a new driveway in Coon Rapids?

Not until it is two years old. Concrete that young has not finished curing, and pressure would permanently etch the surface. Once it passes two years, it can be cleaned like any other slab. Sealing is a separate question: new concrete waits at least 28 days, and Carson prices any sealing in person.

Do you serve all of Coon Rapids?

Yes, every neighborhood in Coon Rapids. Glass House is based in Ham Lake, and Coon Rapids is part of its regular north metro service area, so there is no trip fee. Carson quotes, cleans and walks every job himself, wherever in Coon Rapids your home is.

Can you get oil stains out of my driveway?

Often, and the age of the stain decides how far. Concrete is full of tiny capillaries that draw oil down and outward, so a wash cleans the surface while oil below can rise back up as a shadow. Fresh spills usually come out completely and recent stains nearly so. Old, soaked-in stains improve substantially but may leave a shadow, and more than one application is normal.

Can you remove rust from my driveway?

Yes, with iron-specific chemistry, starting with a spot test. Bleach sets rust rather than removing it, which is why reaching for bleach usually makes the stain worse. Before treating, we make sure the sprinkler that caused it has been re-aimed, or the rust comes back. Iron left long enough bonds to the surface permanently, so the sooner it is treated, the better.

Should I seal my driveway?

Often, yes, and usually with a penetrating sealer. It soaks into the concrete instead of forming a film, so it breathes, cannot peel and holds up to freeze-thaw far better, typically lasting 7 to 10 years. Carson looks at the slab, its age and any previous sealer before recommending anything, and he prices sealing in person.

What should I do with a fresh oil spill?

Act within the first hour, because the clock matters more than the product. Cover the spill with non-clumping clay cat litter or oil-dry, grind it into the surface underfoot so it reaches the oil in the pores, leave it an hour or overnight, then sweep it up and follow with a degreaser.

Request your concrete washing quote in Coon Rapids

Send a few photos or book a walk-around. Carson looks at your home in person and confirms the exact price before any work begins.

or call (612) 294-⁠8796

Fully insured to $2M

Owner-operated

Locally owned in Ham Lake

MORE FROM GLASS HOUSE

bottom of page